Recommendation

It is recommended that the Committee endorse the reallocation of the kerb space on the northern side of Albion Way, Surry Hills, between the points 8 metres and 18 metres west of Little Riley Street as "Works Zone 7.30am-5.30pm Mon-Fri 7.30am-3.30pm Sat”, subject to the following conditions:

(A)      The Applicant must comply with the Works Zone conditions as stipulated in Schedule C of this agenda.

(B)      The Applicant is not permitted to operate any part of a crane over a public road or hoist/swing goods from a Works Zone across or over any part of a public road by means of a lift, hoist or crane unless a separate approval has been obtained from the City's Construction and Building Certification Services Unit as required under Section 68 of the Local Government Act 1993 and Section 138 of the Roads Act 1993.

(C)      The Applicant must notify adjacent properties of the Works Zone at least 14 days prior to installation and must provide a telephone number of the supervisor responsible for the proposed Works Zone and include contact details in the notification letter to be distributed to affected stakeholders.

(D)      The Works Zone is limited to small rigid vehicle up to 6.4 metres in length.

(E)      The Applicant must provide TfNSW-Accredited Traffic Controllers to safely manage the operation of the Works Zone and maintain local vehicular access in Albion Way at all times. If approaching traffic cannot pass a vehicle in the Works Zone, the TfNSW-Accredited Traffic Controllers must instruct the construction vehicle to depart the Works Zone immediately.

Advice

The Committee offered no advice on this Item.

Background

L Armstrong & Co Pty Ltd has requested a 10 metre long Works Zone in Albion Way, Surry Hills.

The Works Zone is to facilitate construction works at 109 Albion Street, Surry Hills.

Report author: Vicki Calleja