Decision Maker: Central Sydney Planning Committee
Decision status: Recommendations Determined
Moved by the Chair (the Lord Mayor), seconded by Councillor Miller -
It is resolved that:
(A) the requirement under Clause 6.21D(2) of the Sydney Local Environmental Plan 2012 requiring a competitive design process is unreasonable or unnecessary in the circumstances;
(B) the requirement under Clause 7.20(3) of the Sydney Local Environmental Plan 2012 requiring the preparation of a development control plan is unreasonable or unnecessary in the circumstances;
(C) the variation requested to Clause 4.3 height of buildings in accordance with Clause 4.6 exceptions to development standards of Sydney Local Environmental Plan 2012 be upheld; and
(D) consent
be granted to Development Application D/2025/1160 subject to the conditions set
out in Attachment
A to the subject report, subject to the following amendments
(additions shown in bold italics, deletions shown in strikethrough):
(a) Development must be in accordance with Development Application No. D/2025/1160 dated 20 November 2025 and the following drawings prepared by Architectus Australia Pty Ltd:
|
Drawing No |
Rev. |
Drawing Name |
Date |
|
DA2-1101S |
A |
Remediation Plan – Basement
Level 3 |
07.11.25 |
|
DA2-1102S |
A |
Remediation Plan – Basement
Level 2 |
07.11.25 |
|
DA2-1103S |
A |
Remediation Plan – Basement
Level 2 - Mezzanine |
07.11.25 |
|
DA2-1104S |
A |
Remediation Plan – Basement
Level 1 |
07.11.25 |
|
DA2-1105 |
A |
Remediation Plan – Ground Level |
07.11.25 |
|
DA2-1106 |
A |
Remediation Plan – Mezzanine |
07.11.25 |
|
DA2-1107 |
B |
Remediation Plan – Level 1 |
13.02.26 |
|
DA2-1108 |
B |
Remediation Plan – Level 2 |
13.02.26 |
|
DA2-1109 |
B |
Remediation Plan – Level 3 |
13.02.26 |
|
DA2-1110 |
B |
Remediation Plan – Level 4 |
13.02.26 |
|
DA2-1111 |
B |
Remediation Plan – Level 5 |
13.02.26 |
|
DA2-1112 |
B |
Remediation Plan – Level 6 |
13.02.26 |
|
DA2-1113 |
B |
Remediation Plan – Level 7 |
13.02.26 |
|
DA2-1114 |
A |
Remediation Plan – Level 8 |
07.11.25 |
|
DA2-1115 |
A |
Remediation Plan – Level 9 |
07.11.25 |
|
DA2-1116 |
A |
Remediation Plan – Level 10 |
07.11.25 |
|
DA2-1117 |
A |
Remediation Plan – Level 11 |
07.11.25 |
|
DA2-1118 |
A |
Remediation Plan – Level 12 |
07.11.25 |
|
DA2-1119 |
A |
Remediation Plan – Level 13 |
07.11.25 |
|
DA2-1120 |
A |
Remediation Plan – Level 14 |
07.11.25 |
|
DA2-1121 |
A |
Remediation Plan – Level 15 |
07.11.25 |
|
DA2-1122 |
A |
Remediation Plan – Level 16 |
07.11.25 |
|
DA2-1123 |
A |
Remediation Plan – Level 17 |
07.11.25 |
|
DA2-1124 |
A |
Remediation Plan – Level 18 |
07.11.25 |
|
DA2-1125 |
A |
Remediation Plan – Level 19 |
07.11.25 |
|
DA2-1126 |
A |
Remediation Plan – Level 20 |
07.11.25 |
|
DA2-1127 |
A |
Remediation Plan – Roof |
07.11.25 |
|
DA2-1160 |
A |
Remediation – Elevation – East |
07.11.25 |
|
DA2-1161 |
A |
Remediation – Elevation – West |
07.11.25 |
|
DA2-1162 |
A |
Remediation – Elevation – North |
07.11.25 |
|
DA2-1163 |
B |
Remediation – Elevation – South |
13.02.26 |
|
DA2-2001S |
A |
General Arrangement Plan –
Basement 3 |
07.11.25 |
|
DA2-2002S |
A |
General Arrangement Plan –
Basement 2 |
07.11.25 |
|
DA2-2004S |
A |
General Arrangement Plan –
Basement 1 |
07.11.25 |
|
DA2-2005 |
B |
General Arrangement Plan –
Ground Floor |
04.02.26 |
|
DA2-2006 |
A |
General Arrangement Plan –
Mezzanine |
07.11.25 |
|
DA2-2101 |
|
General Arrangement Plan – Level
1 |
13.02.26 |
|
DA2-2102 |
|
General Arrangement Plan – Level
2 |
13.02.26 |
|
DA2-2103 |
B |
General Arrangement Plan – Level
3 |
13.02.26 |
|
DA2-2104 |
|
General Arrangement Plan – Level
4 |
13.02.26 |
|
DA2-2105 |
|
General Arrangement Plan – Level
5 |
13.02.26 |
|
DA2-2106 |
|
General Arrangement Plan – Level
6 |
13.02.26 |
|
DA2-2107 |
|
General Arrangement Plan – Level
7 |
13.02.26 |
|
DA2-2108 |
A |
General Arrangement Plan – Level
8 |
07.11.25 |
|
DA2-2109 |
A |
General Arrangement Plan – Level
9 |
07.11.25 |
|
DA2-2110 |
A |
General Arrangement Plan – Level
10 |
07.11.25 |
|
DA2-2111 |
A |
General Arrangement Plan – Level
11 |
07.11.25 |
|
DA2-2112 |
A |
General Arrangement Plan – Level
12 |
07.11.25 |
|
DA2-2113 |
A |
General Arrangement Plan – Level
13 |
07.11.25 |
|
DA2-2114 |
A |
General Arrangement Plan – Level
14 |
07.11.25 |
|
DA2-2115 |
A |
General Arrangement Plan – Level
15 |
07.11.25 |
|
DA2-2116 |
A |
General Arrangement Plan – Level
16 |
07.11.25 |
|
DA2-2117 |
A |
General Arrangement Plan – Level
17 |
07.11.25 |
|
DA2-2118 |
A |
General Arrangement Plan – Level
18 |
07.11.25 |
|
DA2-2119 |
A |
General Arrangement Plan – Level
19 |
07.11.25 |
|
DA2-2120 |
A |
General Arrangement Plan – Level
20 |
07.11.25 |
|
DA2-2121 |
A |
General Arrangement Plan – |
07.11.25 |
|
DA2-2122 |
A |
General Arrangement Plan – |
07.11.25 |
|
DA2-2123 |
A |
General Arrangement Plan – Roof
Plan |
07.11.25 |
|
DA2-3001 |
A |
Elevations – East |
07.11.25 |
|
DA2-3002 |
B |
Elevations – West |
13.02.26 |
|
DA2-3003 |
A |
Elevations – North |
07.11.25 |
|
DA2-3004 |
B |
Elevations – South |
13.02.26 |
|
DA2-3301 |
A |
East-West Section |
07.11.25 |
|
DA2-3302 |
B |
North-South Section |
13.02.26 |
|
DA2-4100 |
B |
Facade Details – General Facade
Type |
07.11.25 |
|
DA2-4101 |
A |
Facade Details – Material
Palette |
07.11.25 |
|
DA2-4102 |
A |
Detailed Elevation – Macquarie
Street |
07.11.25 |
|
DA2-4103 |
A |
Detailed Elevation – Phillip
Street |
07.11.25 |
|
DA2-4104 |
A |
Detailed Elevation – Martin
Place |
07.11.25 |
|
DA2-4105 |
A |
Detailed Elevation – Level 20
Pavilion West |
07.11.25 |
|
DA2-4106 |
A |
Detailed Elevation – Level 20
Pavilion East |
07.11.25 |
|
DA2-4107 |
A |
Detailed Elevation – Level 20
Pavilion South |
07.11.25 |
|
DA2-4108 |
A |
Detailed Elevation – Level 20
Pavilion North |
07.11.25 |
|
DA2-4109 |
A |
Facade Details – Typical Curtain
Wall – North, East & South |
07.11.25 |
|
DA2-4110 |
A |
Facade Details – Typical Curtain
Wall – West |
07.11.25 |
|
DA2-4111 |
A |
Facade Details – Typical Curtain
Wall – Level 16 Balcony |
07.11.25 |
|
DA2-4112 |
A |
Facade Details – Level 18 Plant
Room North |
07.11.25 |
|
DA2-4113 |
A |
Facade Details – Level 18 Plant
Room East & West |
07.11.25 |
|
DA2-4114 |
A |
Facade Details – Typical Level
20 Pavillion |
07.11.25 |
|
DA2-4115 |
A |
Facade Details – Typical Ground
Floor Shopfront |
07.11.25 |
|
DA2-4116 |
B |
Facade Details – Typical Podium |
04.02.26 |
|
DA2-4117 |
A |
Facade Details – Typical Curtain
Wall – |
07.11.25 |
|
DA2-4118 |
B |
Facade Details – Typical Curtain
Wall – |
04.02.26 |
|
DA2-4119 |
A |
Facade Details – Typical Tower
Core – |
07.11.25 |
|
DA2-4120 |
A |
Facade Details – Typical Tower
Core – South |
07.11.25 |
|
DA1200 |
A |
Proposed Layout (Illustrative) |
07.11.25 |
|
DA1201 |
A |
General Arrangement Plan |
07.11.25 |
|
DA4201 |
A |
Planting Plan |
07.11.25 |
|
DA6101 |
A |
Section and Elevation |
07.11.25 |
|
DA9001 |
A |
Section and Detail |
07.11.25 |
and as amended by the conditions of this consent.
(b) In the event of any inconsistency between the approved plans and supplementary documentation, the drawings will prevail.
Reason
To ensure all parties are aware of the approved plans and supporting documentation that applies to the development.
The application was approved for the following reasons:
(A) The proposed development satisfies the objectives of the Environmental Planning and Assessment Act 1979, in that, subject to the imposition of conditions as recommended, it achieves the objectives of the planning controls for the site for the reasons outlined in the report to the Central Sydney Planning Committee.
(B) The proposed development generally satisfies the objectives and provisions of the Sydney Local Environmental Plan 2012 and the Sydney Development Control Plan 2012. Where non-compliances arise, they have been demonstrated to be acceptable in the circumstances of the case or can be resolved by the recommended conditions of consent.
(C) The proposed development will allow the full remediation and reconstruction of the Head Office of the Reserve Bank of Australia in a manner that respects the original 1960s design, including the reintroduction of many external elements that have been lost in later remedial works. The proposed development, subject to the recommended conditions of consent, will conserve the heritage significance of the site in accordance with the Environmental Protection and Biodiversity Conservation Act 1999 (Cth) and Clause 5.10 of the Sydney Local Environmental Plan 2012.
(D) The proposed development complies with the maximum floor space ratio development standard in Clauses 4.4 and 6.4 of the Sydney Local Environmental Plan 2012.
(E) The proposed development complies with the sun access planes for Hyde Park and The Domain in accordance with Clause 6.17 of the Sydney Local Environmental Plan 2012.
(F) Based
upon the material available to the Central Sydney Planning Committee at the
time of determining this application, the
(G) The architectural design, materiality and environmental performance of the proposed development combine to achieve a high-quality design outcome that respects the original 1960s design and satisfy the relevant provisions and matters for consideration in Clause 6.21C of the Sydney Local Environmental Plan 2012.
(H) The proposed development has a height, scale and form suitable for the site and its context, and subject to conditions, satisfactorily responds to the heights and setbacks of neighbouring developments and is appropriate in the streetscape context and setting of the Martin Place special character area.
(I) Subject to the recommended conditions of consent, the proposed development achieves acceptable amenity for the existing and future occupants of the subject and neighbouring sites.
(J) The public interest is served by the approval of the proposed development subject to recommended conditions imposed relating to the appropriate management of associated potential environmental impacts.
(K) Condition 1 was amended to reference the updated drawings submitted during assessment.
Carried unanimously.
D/2025/1160
Report author: Bryan Li
Publication date: 26/03/2026
Date of decision: 19/03/2026
Decided at meeting: 19/03/2026 - Central Sydney Planning Committee
Accompanying Documents: